Quantifying the impact of nontraditional stakeholder involvement on project quality

Rizwan Assainar, Mounir El Asmar

Research output: Chapter in Book/Report/Conference proceedingConference contribution

1 Scopus citations

Abstract

The traditional approach of stakeholders' involvement in architecture, engineering, and construction (AEC) projects typically consists of the architect or engineer's (A/E) involvement in the design phase, and the general contractor or construction manager's (GC or CM) and subcontractors' involvement in the construction phase. Previous research emphasizes the need for the involvement of the GC/CM in the design phase and focuses less on the A/E's participation in the construction phase. This study evaluates the impact on project quality performance of both (1) the GC or CM and subcontractor's involvement in the design phase, and (2) the A/E's involvement in the construction phase. This type of involvement is termed the "non-traditional approach" in the paper. Relevant literature was analyzed, and a data collection instrument was developed and utilized in detailed interviews to gather information on different stakeholders' involvement, as well as quantity performance scores from more than 30 recently completed complex institutional construction projects in the United States. Univariate analyses, such as t-tests and Mann-Whitney-Wilcoxon tests, were performed to evaluate stakeholders' involvement impact on project quality performance. The preliminary findings indicate that non-traditional stakeholder involvement is linked to statistically significant improvements in project quality. The AEC industry can utilize this information as a guide for decision makers, assisting them to select the appropriate level of involvement of various stakeholders at different phases of a project.

Original languageEnglish (US)
Title of host publication22nd Annual Conference of the International Group for Lean Construction: Understanding and Improving Project Based Production, IGLC 2014
PublisherThe International Group for Lean Construction
Pages247-255
Number of pages9
StatePublished - 2014
Event22nd Annual Conference of the International Group for Lean Construction: Understanding and Improving Project Based Production, IGLC 2014 - Oslo, Norway
Duration: Jun 25 2014Jun 27 2014

Other

Other22nd Annual Conference of the International Group for Lean Construction: Understanding and Improving Project Based Production, IGLC 2014
Country/TerritoryNorway
CityOslo
Period6/25/146/27/14

Keywords

  • Integrated project delivery
  • People
  • Quality

ASJC Scopus subject areas

  • Civil and Structural Engineering
  • Building and Construction

Fingerprint

Dive into the research topics of 'Quantifying the impact of nontraditional stakeholder involvement on project quality'. Together they form a unique fingerprint.