T1 - Using PIPS to Minimize Causes of Delay in Saudi Arabian Construction Projects
T2 - University Case Study
AU - Alzara, Majed
AU - Kashiwagi, Jacob
AU - Kashiwagi, Dean
AU - Al-Tassan, Abdulrahman
PY - 2016
Y1 - 2016
N2 - Saudi Arabia has been facing issues with completing construction projects on time and on budget. It has been documented that 70% of public construction projects are delayed. A case study was performed at a University campus in northern Saudi Arabia, identifying the major causes of project delays. The University was experiencing delays from 50% to 150%. The delay factors were gathered from the University Projects Director. The University's delay factors were then compared to delay factors experienced on Saudi construction projects, identified by performing a literature research. The comparison identified nine causes of delays that both studies documented. The study also proposes a solution to minimize the nine major delay factors. A literature research identified one construction management method, the Performance Information Procurement System (PIPS), has documented multiple times its ability to improve project performance and minimize delays.
AB - Saudi Arabia has been facing issues with completing construction projects on time and on budget. It has been documented that 70% of public construction projects are delayed. A case study was performed at a University campus in northern Saudi Arabia, identifying the major causes of project delays. The University was experiencing delays from 50% to 150%. The delay factors were gathered from the University Projects Director. The University's delay factors were then compared to delay factors experienced on Saudi construction projects, identified by performing a literature research. The comparison identified nine causes of delays that both studies documented. The study also proposes a solution to minimize the nine major delay factors. A literature research identified one construction management method, the Performance Information Procurement System (PIPS), has documented multiple times its ability to improve project performance and minimize delays.
KW - best value
KW - delay project causes and factors
KW - performance information procurement system (PIPS)
KW - public construction
KW - Saudi Arabia
UR - http://www.scopus.com/inward/record.url?scp=84999791298&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=84999791298&partnerID=8YFLogxK
U2 - 10.1016/j.proeng.2016.04.121
DO - 10.1016/j.proeng.2016.04.121
M3 - Article
AN - SCOPUS:84999791298
VL - 145
SP - 932
EP - 939
JO - Procedia Engineering
JF - Procedia Engineering
SN - 1877-7058
ER -