The Perception of the Government and Private Sectors on the Procurement System Delivery Method in Saudi Arabia

Ahmed Alofi, Jacob Kashiwagi, Dean Kashiwagi

Research output: Contribution to journalArticle

Abstract

This paper is part of doctoral research to improve the current Saudi Arabian (SA) procurement system. SA has the largest construction market in the Middle East. However, the use of the traditional procurement system in SA has been identified as one of the causes for poor performance in the delivery of construction. The system has been identified as a major risk to the SA government, due to consistent increased costs and delays of up to 70% on projects. A survey was conducted with 1396 participants including engineers, buyers, contractors, consultants, academics, and architects. The purpose of the survey was to identify the validity of the recent claims that the procurement system in SA is broken. The participants work in both the private and government sectors. The survey results showed that the procurement system is a major risk to projects, affects construction projects negatively, and is in need of improvement.

Original languageEnglish (US)
Pages (from-to)1394-1401
Number of pages8
JournalProcedia Engineering
Volume145
DOIs
StatePublished - 2016

Fingerprint

Contractors
Engineers
Costs

Keywords

  • construction industry
  • delays of construction projects
  • low bid
  • procurement system
  • Saudi Arabia

ASJC Scopus subject areas

  • Engineering(all)

Cite this

The Perception of the Government and Private Sectors on the Procurement System Delivery Method in Saudi Arabia. / Alofi, Ahmed; Kashiwagi, Jacob; Kashiwagi, Dean.

In: Procedia Engineering, Vol. 145, 2016, p. 1394-1401.

Research output: Contribution to journalArticle

Alofi, Ahmed ; Kashiwagi, Jacob ; Kashiwagi, Dean. / The Perception of the Government and Private Sectors on the Procurement System Delivery Method in Saudi Arabia. In: Procedia Engineering. 2016 ; Vol. 145. pp. 1394-1401.
@article{7637a996f60747d29fc8c8b16626fcb1,
title = "The Perception of the Government and Private Sectors on the Procurement System Delivery Method in Saudi Arabia",
abstract = "This paper is part of doctoral research to improve the current Saudi Arabian (SA) procurement system. SA has the largest construction market in the Middle East. However, the use of the traditional procurement system in SA has been identified as one of the causes for poor performance in the delivery of construction. The system has been identified as a major risk to the SA government, due to consistent increased costs and delays of up to 70{\%} on projects. A survey was conducted with 1396 participants including engineers, buyers, contractors, consultants, academics, and architects. The purpose of the survey was to identify the validity of the recent claims that the procurement system in SA is broken. The participants work in both the private and government sectors. The survey results showed that the procurement system is a major risk to projects, affects construction projects negatively, and is in need of improvement.",
keywords = "construction industry, delays of construction projects, low bid, procurement system, Saudi Arabia",
author = "Ahmed Alofi and Jacob Kashiwagi and Dean Kashiwagi",
year = "2016",
doi = "10.1016/j.proeng.2016.04.175",
language = "English (US)",
volume = "145",
pages = "1394--1401",
journal = "Procedia Engineering",
issn = "1877-7058",
publisher = "Elsevier BV",

}

TY - JOUR

T1 - The Perception of the Government and Private Sectors on the Procurement System Delivery Method in Saudi Arabia

AU - Alofi, Ahmed

AU - Kashiwagi, Jacob

AU - Kashiwagi, Dean

PY - 2016

Y1 - 2016

N2 - This paper is part of doctoral research to improve the current Saudi Arabian (SA) procurement system. SA has the largest construction market in the Middle East. However, the use of the traditional procurement system in SA has been identified as one of the causes for poor performance in the delivery of construction. The system has been identified as a major risk to the SA government, due to consistent increased costs and delays of up to 70% on projects. A survey was conducted with 1396 participants including engineers, buyers, contractors, consultants, academics, and architects. The purpose of the survey was to identify the validity of the recent claims that the procurement system in SA is broken. The participants work in both the private and government sectors. The survey results showed that the procurement system is a major risk to projects, affects construction projects negatively, and is in need of improvement.

AB - This paper is part of doctoral research to improve the current Saudi Arabian (SA) procurement system. SA has the largest construction market in the Middle East. However, the use of the traditional procurement system in SA has been identified as one of the causes for poor performance in the delivery of construction. The system has been identified as a major risk to the SA government, due to consistent increased costs and delays of up to 70% on projects. A survey was conducted with 1396 participants including engineers, buyers, contractors, consultants, academics, and architects. The purpose of the survey was to identify the validity of the recent claims that the procurement system in SA is broken. The participants work in both the private and government sectors. The survey results showed that the procurement system is a major risk to projects, affects construction projects negatively, and is in need of improvement.

KW - construction industry

KW - delays of construction projects

KW - low bid

KW - procurement system

KW - Saudi Arabia

UR - http://www.scopus.com/inward/record.url?scp=84999864924&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84999864924&partnerID=8YFLogxK

U2 - 10.1016/j.proeng.2016.04.175

DO - 10.1016/j.proeng.2016.04.175

M3 - Article

AN - SCOPUS:84999864924

VL - 145

SP - 1394

EP - 1401

JO - Procedia Engineering

JF - Procedia Engineering

SN - 1877-7058

ER -