The Perception of the Government and Private Sectors on the Procurement System Delivery Method in Saudi Arabia

Ahmed Alofi, Jacob Kashiwagi, Dean Kashiwagi

Research output: Contribution to journalConference articlepeer-review

4 Scopus citations

Abstract

This paper is part of doctoral research to improve the current Saudi Arabian (SA) procurement system. SA has the largest construction market in the Middle East. However, the use of the traditional procurement system in SA has been identified as one of the causes for poor performance in the delivery of construction. The system has been identified as a major risk to the SA government, due to consistent increased costs and delays of up to 70% on projects. A survey was conducted with 1396 participants including engineers, buyers, contractors, consultants, academics, and architects. The purpose of the survey was to identify the validity of the recent claims that the procurement system in SA is broken. The participants work in both the private and government sectors. The survey results showed that the procurement system is a major risk to projects, affects construction projects negatively, and is in need of improvement.

Original languageEnglish (US)
Pages (from-to)1394-1401
Number of pages8
JournalProcedia Engineering
Volume145
DOIs
StatePublished - 2016
EventInternational Conference on Sustainable Design, Engineering and Construction, ICSDEC 2016 - Tempe, United States
Duration: May 18 2016May 20 2016

Keywords

  • Saudi Arabia
  • construction industry
  • delays of construction projects
  • low bid
  • procurement system

ASJC Scopus subject areas

  • General Engineering

Fingerprint

Dive into the research topics of 'The Perception of the Government and Private Sectors on the Procurement System Delivery Method in Saudi Arabia'. Together they form a unique fingerprint.

Cite this