    Abstract

    The state of Utah has experienced problems in the procurement of construction. Similar to other states using low-bid, Utah historically has not had construction projects delivered on time and within budget. Faced with critical projects to prepare for the 2002 Olympics, overworked construction project managers, and construction litigation caused by low-bidding contractors, the Division of Facilities Construction and Management tested the Performance Information Procurement System (PIPS) in the fall of 1998 on the University of Utah Housing Project Phase II for the 2002 Olympic Housing. Five other tests were conducted. This article analyzes the differences between the PIPS and the Utah low-bid procurement system, the results of the state of Utah tests, problems, and modifications to the PIPS, and recommendations to future users of the PIPS. Major contributions of this article include the PIPS, Kashiwagi's Information Measurement Theory, and Zeleny's Displaced Ideal Model. The objective of this article is to use an information-based business process to procure contractors who deliver on time and on budget and meet quality expectations.

    Original languageEnglish (US)
    Pages (from-to)338-347
    Number of pages10
    JournalJournal of Construction Engineering and Management
    Volume128
    Issue number4
    DOIs
    StatePublished - Jul 2002

    Fingerprint

    Information systems
    Contractors
    Measurement theory
    Information use
    Managers
    Procurement
    Industry
    Bid
    Olympics
    Construction project

    Keywords

    • Construction management
    • Purchasing
    • State government
    • Utah

    ASJC Scopus subject areas

    • Building and Construction
    • Civil and Structural Engineering
    • Industrial and Manufacturing Engineering

    Cite this

    State of Utah Performance Information Procurement System tests. / Kashiwagi, Dean; Byfield, Richard.

    In: Journal of Construction Engineering and Management, Vol. 128, No. 4, 07.2002, p. 338-347.

    Research output: Contribution to journalArticle

    Kashiwagi, Dean ; Byfield, Richard. / State of Utah Performance Information Procurement System tests. In: Journal of Construction Engineering and Management. 2002 ; Vol. 128, No. 4. pp. 338-347.
    @article{a6b87b09a4f3441bbfd97c09da5d5570,
    title = "State of Utah Performance Information Procurement System tests",
    abstract = "The state of Utah has experienced problems in the procurement of construction. Similar to other states using low-bid, Utah historically has not had construction projects delivered on time and within budget. Faced with critical projects to prepare for the 2002 Olympics, overworked construction project managers, and construction litigation caused by low-bidding contractors, the Division of Facilities Construction and Management tested the Performance Information Procurement System (PIPS) in the fall of 1998 on the University of Utah Housing Project Phase II for the 2002 Olympic Housing. Five other tests were conducted. This article analyzes the differences between the PIPS and the Utah low-bid procurement system, the results of the state of Utah tests, problems, and modifications to the PIPS, and recommendations to future users of the PIPS. Major contributions of this article include the PIPS, Kashiwagi's Information Measurement Theory, and Zeleny's Displaced Ideal Model. The objective of this article is to use an information-based business process to procure contractors who deliver on time and on budget and meet quality expectations.",
    keywords = "Construction management, Purchasing, State government, Utah",
    author = "Dean Kashiwagi and Richard Byfield",
    year = "2002",
    month = "7",
    doi = "10.1061/(ASCE)0733-9364(2002)128:4(338)",
    language = "English (US)",
    volume = "128",
    pages = "338--347",
    journal = "Journal of Construction Engineering and Management - ASCE",
    issn = "0733-9364",
    publisher = "American Society of Civil Engineers (ASCE)",
    number = "4",

    }

    TY - JOUR

    T1 - State of Utah Performance Information Procurement System tests

    AU - Kashiwagi, Dean

    AU - Byfield, Richard

    PY - 2002/7

    Y1 - 2002/7

    N2 - The state of Utah has experienced problems in the procurement of construction. Similar to other states using low-bid, Utah historically has not had construction projects delivered on time and within budget. Faced with critical projects to prepare for the 2002 Olympics, overworked construction project managers, and construction litigation caused by low-bidding contractors, the Division of Facilities Construction and Management tested the Performance Information Procurement System (PIPS) in the fall of 1998 on the University of Utah Housing Project Phase II for the 2002 Olympic Housing. Five other tests were conducted. This article analyzes the differences between the PIPS and the Utah low-bid procurement system, the results of the state of Utah tests, problems, and modifications to the PIPS, and recommendations to future users of the PIPS. Major contributions of this article include the PIPS, Kashiwagi's Information Measurement Theory, and Zeleny's Displaced Ideal Model. The objective of this article is to use an information-based business process to procure contractors who deliver on time and on budget and meet quality expectations.

    AB - The state of Utah has experienced problems in the procurement of construction. Similar to other states using low-bid, Utah historically has not had construction projects delivered on time and within budget. Faced with critical projects to prepare for the 2002 Olympics, overworked construction project managers, and construction litigation caused by low-bidding contractors, the Division of Facilities Construction and Management tested the Performance Information Procurement System (PIPS) in the fall of 1998 on the University of Utah Housing Project Phase II for the 2002 Olympic Housing. Five other tests were conducted. This article analyzes the differences between the PIPS and the Utah low-bid procurement system, the results of the state of Utah tests, problems, and modifications to the PIPS, and recommendations to future users of the PIPS. Major contributions of this article include the PIPS, Kashiwagi's Information Measurement Theory, and Zeleny's Displaced Ideal Model. The objective of this article is to use an information-based business process to procure contractors who deliver on time and on budget and meet quality expectations.

    KW - Construction management

    KW - Purchasing

    KW - State government

    KW - Utah

    UR - http://www.scopus.com/inward/record.url?scp=13944284513&partnerID=8YFLogxK

    UR - http://www.scopus.com/inward/citedby.url?scp=13944284513&partnerID=8YFLogxK

    U2 - 10.1061/(ASCE)0733-9364(2002)128:4(338)

    DO - 10.1061/(ASCE)0733-9364(2002)128:4(338)

    M3 - Article

    VL - 128

    SP - 338

    EP - 347

    JO - Journal of Construction Engineering and Management - ASCE

    JF - Journal of Construction Engineering and Management - ASCE

    SN - 0733-9364

    IS - 4

    ER -