Scheduling methods for the statistical setup adjustment problem

Rong Pan, Enrique Del Castillo

Research output: Contribution to journalArticle

8 Citations (Scopus)

Abstract

Feedback control methods have been proposed in recent literature to regulate the quality characteristic of parts or products in a manufacturing process. Depending on the costs involved, adjustments may not be needed at each time instant (i.e. for every part or product). This paper presents scheduling methods to determine the optimal time instants for adjusting a process. The focus is on the set-up adjustment problem, in which it is necessary to adjust the process in order to compensate for an initial offset that occurs due to an incorrect set-up operation. The performance of three scheduling methods are compared in terms of the expected manufacturing cost and computational effort of each method. The adjustment methods considered are based on estimates of the process variance and the size of the offset. The robustness of these methods with respect to biased estimates of the process variance and of the set-up error or offset are discussed. One simple method, a backward implementation of the Silver-Meal heuristic used for inventory control is recommended based on a performance analysis.

Original languageEnglish (US)
Pages (from-to)1467-1481
Number of pages15
JournalInternational Journal of Production Research
Volume41
Issue number7
DOIs
StatePublished - May 10 2003
Externally publishedYes

Fingerprint

Scheduling
Inventory control
Feedback control
Costs
Silver

ASJC Scopus subject areas

  • Industrial and Manufacturing Engineering
  • Management Science and Operations Research

Cite this

Scheduling methods for the statistical setup adjustment problem. / Pan, Rong; Del Castillo, Enrique.

In: International Journal of Production Research, Vol. 41, No. 7, 10.05.2003, p. 1467-1481.

Research output: Contribution to journalArticle

@article{d66891c2e1c04ad3af10282c4436df16,
title = "Scheduling methods for the statistical setup adjustment problem",
abstract = "Feedback control methods have been proposed in recent literature to regulate the quality characteristic of parts or products in a manufacturing process. Depending on the costs involved, adjustments may not be needed at each time instant (i.e. for every part or product). This paper presents scheduling methods to determine the optimal time instants for adjusting a process. The focus is on the set-up adjustment problem, in which it is necessary to adjust the process in order to compensate for an initial offset that occurs due to an incorrect set-up operation. The performance of three scheduling methods are compared in terms of the expected manufacturing cost and computational effort of each method. The adjustment methods considered are based on estimates of the process variance and the size of the offset. The robustness of these methods with respect to biased estimates of the process variance and of the set-up error or offset are discussed. One simple method, a backward implementation of the Silver-Meal heuristic used for inventory control is recommended based on a performance analysis.",
author = "Rong Pan and {Del Castillo}, Enrique",
year = "2003",
month = "5",
day = "10",
doi = "10.1080/0020754031000065142",
language = "English (US)",
volume = "41",
pages = "1467--1481",
journal = "International Journal of Production Research",
issn = "0020-7543",
publisher = "Taylor and Francis Ltd.",
number = "7",

}

TY - JOUR

T1 - Scheduling methods for the statistical setup adjustment problem

AU - Pan, Rong

AU - Del Castillo, Enrique

PY - 2003/5/10

Y1 - 2003/5/10

N2 - Feedback control methods have been proposed in recent literature to regulate the quality characteristic of parts or products in a manufacturing process. Depending on the costs involved, adjustments may not be needed at each time instant (i.e. for every part or product). This paper presents scheduling methods to determine the optimal time instants for adjusting a process. The focus is on the set-up adjustment problem, in which it is necessary to adjust the process in order to compensate for an initial offset that occurs due to an incorrect set-up operation. The performance of three scheduling methods are compared in terms of the expected manufacturing cost and computational effort of each method. The adjustment methods considered are based on estimates of the process variance and the size of the offset. The robustness of these methods with respect to biased estimates of the process variance and of the set-up error or offset are discussed. One simple method, a backward implementation of the Silver-Meal heuristic used for inventory control is recommended based on a performance analysis.

AB - Feedback control methods have been proposed in recent literature to regulate the quality characteristic of parts or products in a manufacturing process. Depending on the costs involved, adjustments may not be needed at each time instant (i.e. for every part or product). This paper presents scheduling methods to determine the optimal time instants for adjusting a process. The focus is on the set-up adjustment problem, in which it is necessary to adjust the process in order to compensate for an initial offset that occurs due to an incorrect set-up operation. The performance of three scheduling methods are compared in terms of the expected manufacturing cost and computational effort of each method. The adjustment methods considered are based on estimates of the process variance and the size of the offset. The robustness of these methods with respect to biased estimates of the process variance and of the set-up error or offset are discussed. One simple method, a backward implementation of the Silver-Meal heuristic used for inventory control is recommended based on a performance analysis.

UR - http://www.scopus.com/inward/record.url?scp=0242301584&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=0242301584&partnerID=8YFLogxK

U2 - 10.1080/0020754031000065142

DO - 10.1080/0020754031000065142

M3 - Article

AN - SCOPUS:0242301584

VL - 41

SP - 1467

EP - 1481

JO - International Journal of Production Research

JF - International Journal of Production Research

SN - 0020-7543

IS - 7

ER -