Operation and upgrades of the LCLS

J. Frisch, R. Akre, J. Arthur, R. Bionta, C. Bostedt, J. Bozek, A. Brachmann, P. Bucksbaum, R. Coffee, F. J. Decker, Y. Ding, D. Dowell, S. Edstrom, P. Emma, A. Fisher, S. Gilevich, J. Hastings, G. Hays, P. Hering, Z. HuangR. Iverson, H. Loos, Marc Messerschmidt, A. Miahnahri, S. Moeller, H. D. Nuhn, G. Pile, D. Ratner, J. Rzepiela, D. Schultz, T. Smith, H. Tompkins, J. Turner, J. Welch, W. White, J. Wu, G. Yocky, J. Galayda

Research output: Contribution to conferencePaper

2 Citations (Scopus)

Abstract

The LCLS FEL began user operations in September 2009 with photon energies from 800eV to 2 KeV and pulse energies above 2 mJ. Both long pulse (50-200 femtosecond FWHM) and short pulse (<10 femtosecond FWHM at 150 uJ) pulses were delivered at user request. In addition the FEL was operated at fundamental photon energies up to 10 KeV in preparation for hard X-ray experiments. FEL operating parameters, performance and reliability results will be presented, in addition to plans for upgrades to the facility.

Original languageEnglish (US)
Pages694-697
Number of pages4
StatePublished - Dec 1 2011
Externally publishedYes
Event25th International Linear Accelerator Conference, LINAC 2010 - Tsukuba, Ibaraki, Japan
Duration: Sep 12 2010Sep 17 2010

Other

Other25th International Linear Accelerator Conference, LINAC 2010
CountryJapan
CityTsukuba, Ibaraki
Period9/12/109/17/10

Fingerprint

pulses
photons
energy
preparation
x rays

ASJC Scopus subject areas

  • Atomic and Molecular Physics, and Optics

Cite this

Frisch, J., Akre, R., Arthur, J., Bionta, R., Bostedt, C., Bozek, J., ... Galayda, J. (2011). Operation and upgrades of the LCLS. 694-697. Paper presented at 25th International Linear Accelerator Conference, LINAC 2010, Tsukuba, Ibaraki, Japan.

Operation and upgrades of the LCLS. / Frisch, J.; Akre, R.; Arthur, J.; Bionta, R.; Bostedt, C.; Bozek, J.; Brachmann, A.; Bucksbaum, P.; Coffee, R.; Decker, F. J.; Ding, Y.; Dowell, D.; Edstrom, S.; Emma, P.; Fisher, A.; Gilevich, S.; Hastings, J.; Hays, G.; Hering, P.; Huang, Z.; Iverson, R.; Loos, H.; Messerschmidt, Marc; Miahnahri, A.; Moeller, S.; Nuhn, H. D.; Pile, G.; Ratner, D.; Rzepiela, J.; Schultz, D.; Smith, T.; Tompkins, H.; Turner, J.; Welch, J.; White, W.; Wu, J.; Yocky, G.; Galayda, J.

2011. 694-697 Paper presented at 25th International Linear Accelerator Conference, LINAC 2010, Tsukuba, Ibaraki, Japan.

Research output: Contribution to conferencePaper

Frisch, J, Akre, R, Arthur, J, Bionta, R, Bostedt, C, Bozek, J, Brachmann, A, Bucksbaum, P, Coffee, R, Decker, FJ, Ding, Y, Dowell, D, Edstrom, S, Emma, P, Fisher, A, Gilevich, S, Hastings, J, Hays, G, Hering, P, Huang, Z, Iverson, R, Loos, H, Messerschmidt, M, Miahnahri, A, Moeller, S, Nuhn, HD, Pile, G, Ratner, D, Rzepiela, J, Schultz, D, Smith, T, Tompkins, H, Turner, J, Welch, J, White, W, Wu, J, Yocky, G & Galayda, J 2011, 'Operation and upgrades of the LCLS', Paper presented at 25th International Linear Accelerator Conference, LINAC 2010, Tsukuba, Ibaraki, Japan, 9/12/10 - 9/17/10 pp. 694-697.
Frisch J, Akre R, Arthur J, Bionta R, Bostedt C, Bozek J et al. Operation and upgrades of the LCLS. 2011. Paper presented at 25th International Linear Accelerator Conference, LINAC 2010, Tsukuba, Ibaraki, Japan.
Frisch, J. ; Akre, R. ; Arthur, J. ; Bionta, R. ; Bostedt, C. ; Bozek, J. ; Brachmann, A. ; Bucksbaum, P. ; Coffee, R. ; Decker, F. J. ; Ding, Y. ; Dowell, D. ; Edstrom, S. ; Emma, P. ; Fisher, A. ; Gilevich, S. ; Hastings, J. ; Hays, G. ; Hering, P. ; Huang, Z. ; Iverson, R. ; Loos, H. ; Messerschmidt, Marc ; Miahnahri, A. ; Moeller, S. ; Nuhn, H. D. ; Pile, G. ; Ratner, D. ; Rzepiela, J. ; Schultz, D. ; Smith, T. ; Tompkins, H. ; Turner, J. ; Welch, J. ; White, W. ; Wu, J. ; Yocky, G. ; Galayda, J. / Operation and upgrades of the LCLS. Paper presented at 25th International Linear Accelerator Conference, LINAC 2010, Tsukuba, Ibaraki, Japan.4 p.
@conference{c7ee99ff0b704640accfed57904259b8,
title = "Operation and upgrades of the LCLS",
abstract = "The LCLS FEL began user operations in September 2009 with photon energies from 800eV to 2 KeV and pulse energies above 2 mJ. Both long pulse (50-200 femtosecond FWHM) and short pulse (<10 femtosecond FWHM at 150 uJ) pulses were delivered at user request. In addition the FEL was operated at fundamental photon energies up to 10 KeV in preparation for hard X-ray experiments. FEL operating parameters, performance and reliability results will be presented, in addition to plans for upgrades to the facility.",
author = "J. Frisch and R. Akre and J. Arthur and R. Bionta and C. Bostedt and J. Bozek and A. Brachmann and P. Bucksbaum and R. Coffee and Decker, {F. J.} and Y. Ding and D. Dowell and S. Edstrom and P. Emma and A. Fisher and S. Gilevich and J. Hastings and G. Hays and P. Hering and Z. Huang and R. Iverson and H. Loos and Marc Messerschmidt and A. Miahnahri and S. Moeller and Nuhn, {H. D.} and G. Pile and D. Ratner and J. Rzepiela and D. Schultz and T. Smith and H. Tompkins and J. Turner and J. Welch and W. White and J. Wu and G. Yocky and J. Galayda",
year = "2011",
month = "12",
day = "1",
language = "English (US)",
pages = "694--697",
note = "25th International Linear Accelerator Conference, LINAC 2010 ; Conference date: 12-09-2010 Through 17-09-2010",

}

TY - CONF

T1 - Operation and upgrades of the LCLS

AU - Frisch, J.

AU - Akre, R.

AU - Arthur, J.

AU - Bionta, R.

AU - Bostedt, C.

AU - Bozek, J.

AU - Brachmann, A.

AU - Bucksbaum, P.

AU - Coffee, R.

AU - Decker, F. J.

AU - Ding, Y.

AU - Dowell, D.

AU - Edstrom, S.

AU - Emma, P.

AU - Fisher, A.

AU - Gilevich, S.

AU - Hastings, J.

AU - Hays, G.

AU - Hering, P.

AU - Huang, Z.

AU - Iverson, R.

AU - Loos, H.

AU - Messerschmidt, Marc

AU - Miahnahri, A.

AU - Moeller, S.

AU - Nuhn, H. D.

AU - Pile, G.

AU - Ratner, D.

AU - Rzepiela, J.

AU - Schultz, D.

AU - Smith, T.

AU - Tompkins, H.

AU - Turner, J.

AU - Welch, J.

AU - White, W.

AU - Wu, J.

AU - Yocky, G.

AU - Galayda, J.

PY - 2011/12/1

Y1 - 2011/12/1

N2 - The LCLS FEL began user operations in September 2009 with photon energies from 800eV to 2 KeV and pulse energies above 2 mJ. Both long pulse (50-200 femtosecond FWHM) and short pulse (<10 femtosecond FWHM at 150 uJ) pulses were delivered at user request. In addition the FEL was operated at fundamental photon energies up to 10 KeV in preparation for hard X-ray experiments. FEL operating parameters, performance and reliability results will be presented, in addition to plans for upgrades to the facility.

AB - The LCLS FEL began user operations in September 2009 with photon energies from 800eV to 2 KeV and pulse energies above 2 mJ. Both long pulse (50-200 femtosecond FWHM) and short pulse (<10 femtosecond FWHM at 150 uJ) pulses were delivered at user request. In addition the FEL was operated at fundamental photon energies up to 10 KeV in preparation for hard X-ray experiments. FEL operating parameters, performance and reliability results will be presented, in addition to plans for upgrades to the facility.

UR - http://www.scopus.com/inward/record.url?scp=84888335582&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84888335582&partnerID=8YFLogxK

M3 - Paper

AN - SCOPUS:84888335582

SP - 694

EP - 697

ER -