Improving the cost and schedule control system

Mohammed S. El-Mashaleh, Allan D. Chasey

Research output: Contribution to journalArticle

2 Citations (Scopus)

Abstract

One of the most important challenges facing project managers today is controlling cost and schedule overruns. A cost and schedule control system must be established to deliver construction projects on time and within budget. This system must provide the information needed for a project team so that actual performance can be compared to planned performance in a format that provides a valid, timely picture of the project status while also isolating problem areas that require particular attention from management. A research survey conducted among 22 construction management professionals involved in advanced technology facility projects (cleanroom construction) and 19 construction management professionals involved in conventional facility projects (conventional construction) showed that cleanroom contractors achieve their cost and schedule goals much more consistently than conventional contractors. Based on the lessons learned from cleanroom contractors, this article provides recommendations for conventional contractors to improve their cost and schedule control systems.

Original languageEnglish (US)
Pages (from-to)39-41
Number of pages3
JournalCost Engineering (Morgantown, West Virginia)
Volume41
Issue number7
StatePublished - Jul 1999
Externally publishedYes

Fingerprint

Contractors
Control systems
Costs
Managers

ASJC Scopus subject areas

  • Industrial and Manufacturing Engineering

Cite this

El-Mashaleh, M. S., & Chasey, A. D. (1999). Improving the cost and schedule control system. Cost Engineering (Morgantown, West Virginia), 41(7), 39-41.

Improving the cost and schedule control system. / El-Mashaleh, Mohammed S.; Chasey, Allan D.

In: Cost Engineering (Morgantown, West Virginia), Vol. 41, No. 7, 07.1999, p. 39-41.

Research output: Contribution to journalArticle

El-Mashaleh, MS & Chasey, AD 1999, 'Improving the cost and schedule control system', Cost Engineering (Morgantown, West Virginia), vol. 41, no. 7, pp. 39-41.
El-Mashaleh, Mohammed S. ; Chasey, Allan D. / Improving the cost and schedule control system. In: Cost Engineering (Morgantown, West Virginia). 1999 ; Vol. 41, No. 7. pp. 39-41.
@article{119c51eaf1304938a9a2fdf4b7eed092,
title = "Improving the cost and schedule control system",
abstract = "One of the most important challenges facing project managers today is controlling cost and schedule overruns. A cost and schedule control system must be established to deliver construction projects on time and within budget. This system must provide the information needed for a project team so that actual performance can be compared to planned performance in a format that provides a valid, timely picture of the project status while also isolating problem areas that require particular attention from management. A research survey conducted among 22 construction management professionals involved in advanced technology facility projects (cleanroom construction) and 19 construction management professionals involved in conventional facility projects (conventional construction) showed that cleanroom contractors achieve their cost and schedule goals much more consistently than conventional contractors. Based on the lessons learned from cleanroom contractors, this article provides recommendations for conventional contractors to improve their cost and schedule control systems.",
author = "El-Mashaleh, {Mohammed S.} and Chasey, {Allan D.}",
year = "1999",
month = "7",
language = "English (US)",
volume = "41",
pages = "39--41",
journal = "Cost Engineering (Morgantown, West Virginia)",
issn = "0274-9696",
publisher = "AACE International",
number = "7",

}

TY - JOUR

T1 - Improving the cost and schedule control system

AU - El-Mashaleh, Mohammed S.

AU - Chasey, Allan D.

PY - 1999/7

Y1 - 1999/7

N2 - One of the most important challenges facing project managers today is controlling cost and schedule overruns. A cost and schedule control system must be established to deliver construction projects on time and within budget. This system must provide the information needed for a project team so that actual performance can be compared to planned performance in a format that provides a valid, timely picture of the project status while also isolating problem areas that require particular attention from management. A research survey conducted among 22 construction management professionals involved in advanced technology facility projects (cleanroom construction) and 19 construction management professionals involved in conventional facility projects (conventional construction) showed that cleanroom contractors achieve their cost and schedule goals much more consistently than conventional contractors. Based on the lessons learned from cleanroom contractors, this article provides recommendations for conventional contractors to improve their cost and schedule control systems.

AB - One of the most important challenges facing project managers today is controlling cost and schedule overruns. A cost and schedule control system must be established to deliver construction projects on time and within budget. This system must provide the information needed for a project team so that actual performance can be compared to planned performance in a format that provides a valid, timely picture of the project status while also isolating problem areas that require particular attention from management. A research survey conducted among 22 construction management professionals involved in advanced technology facility projects (cleanroom construction) and 19 construction management professionals involved in conventional facility projects (conventional construction) showed that cleanroom contractors achieve their cost and schedule goals much more consistently than conventional contractors. Based on the lessons learned from cleanroom contractors, this article provides recommendations for conventional contractors to improve their cost and schedule control systems.

UR - http://www.scopus.com/inward/record.url?scp=0032594626&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=0032594626&partnerID=8YFLogxK

M3 - Article

VL - 41

SP - 39

EP - 41

JO - Cost Engineering (Morgantown, West Virginia)

JF - Cost Engineering (Morgantown, West Virginia)

SN - 0274-9696

IS - 7

ER -