Impact of shift work on labor productivity for labor intensive contractor

Awad S. Hanna, Chul Ki Chang, Kenneth Sullivan, Jeffery A. Lackney

Research output: Contribution to journalArticle

59 Citations (Scopus)

Abstract

Generally, a contractor has three options in accelerating a construction schedule: working longer hours, increasing the number of workers, or creating an additional shift of workers. There has been a significant amount of research conducted on scheduled overtime on construction labor productivity. However, little information has been found in the literature addressing the labor inefficiency associated with working a second shift. This paper has qualitative and quantitative components. The qualitative part details why and how shift work affects labor productivity, and then addresses the appropriate use of shift work. The quantitative component determines the relationship between the length of shift work and labor efficiency. The results of the research show that shift work has the potential to be both beneficial and detrimental to the productivity of construction labor. Small amounts of well-organized shift work can serve as a very effective response to schedule compression. The productivity loss, obtained from the quantification model developed through this study, ranges from -11 to 17% depending on the amount of shift work used.

Original languageEnglish (US)
Pages (from-to)197-204
Number of pages8
JournalJournal of Construction Engineering and Management
Volume134
Issue number3
DOIs
StatePublished - 2008

Fingerprint

Contractors
Productivity
Personnel
Shift work
Labour productivity
Labor
Schedule
Workers

Keywords

  • Construction industry
  • Contractors
  • Labor
  • Productivity
  • Scheduling

ASJC Scopus subject areas

  • Building and Construction
  • Civil and Structural Engineering
  • Industrial and Manufacturing Engineering

Cite this

Impact of shift work on labor productivity for labor intensive contractor. / Hanna, Awad S.; Chang, Chul Ki; Sullivan, Kenneth; Lackney, Jeffery A.

In: Journal of Construction Engineering and Management, Vol. 134, No. 3, 2008, p. 197-204.

Research output: Contribution to journalArticle

Hanna, Awad S. ; Chang, Chul Ki ; Sullivan, Kenneth ; Lackney, Jeffery A. / Impact of shift work on labor productivity for labor intensive contractor. In: Journal of Construction Engineering and Management. 2008 ; Vol. 134, No. 3. pp. 197-204.
@article{f805386d1d1d44c599b3aae9a079c4b4,
title = "Impact of shift work on labor productivity for labor intensive contractor",
abstract = "Generally, a contractor has three options in accelerating a construction schedule: working longer hours, increasing the number of workers, or creating an additional shift of workers. There has been a significant amount of research conducted on scheduled overtime on construction labor productivity. However, little information has been found in the literature addressing the labor inefficiency associated with working a second shift. This paper has qualitative and quantitative components. The qualitative part details why and how shift work affects labor productivity, and then addresses the appropriate use of shift work. The quantitative component determines the relationship between the length of shift work and labor efficiency. The results of the research show that shift work has the potential to be both beneficial and detrimental to the productivity of construction labor. Small amounts of well-organized shift work can serve as a very effective response to schedule compression. The productivity loss, obtained from the quantification model developed through this study, ranges from -11 to 17{\%} depending on the amount of shift work used.",
keywords = "Construction industry, Contractors, Labor, Productivity, Scheduling",
author = "Hanna, {Awad S.} and Chang, {Chul Ki} and Kenneth Sullivan and Lackney, {Jeffery A.}",
year = "2008",
doi = "10.1061/(ASCE)0733-9364(2008)134:3(197)",
language = "English (US)",
volume = "134",
pages = "197--204",
journal = "Journal of Construction Engineering and Management - ASCE",
issn = "0733-9364",
publisher = "American Society of Civil Engineers (ASCE)",
number = "3",

}

TY - JOUR

T1 - Impact of shift work on labor productivity for labor intensive contractor

AU - Hanna, Awad S.

AU - Chang, Chul Ki

AU - Sullivan, Kenneth

AU - Lackney, Jeffery A.

PY - 2008

Y1 - 2008

N2 - Generally, a contractor has three options in accelerating a construction schedule: working longer hours, increasing the number of workers, or creating an additional shift of workers. There has been a significant amount of research conducted on scheduled overtime on construction labor productivity. However, little information has been found in the literature addressing the labor inefficiency associated with working a second shift. This paper has qualitative and quantitative components. The qualitative part details why and how shift work affects labor productivity, and then addresses the appropriate use of shift work. The quantitative component determines the relationship between the length of shift work and labor efficiency. The results of the research show that shift work has the potential to be both beneficial and detrimental to the productivity of construction labor. Small amounts of well-organized shift work can serve as a very effective response to schedule compression. The productivity loss, obtained from the quantification model developed through this study, ranges from -11 to 17% depending on the amount of shift work used.

AB - Generally, a contractor has three options in accelerating a construction schedule: working longer hours, increasing the number of workers, or creating an additional shift of workers. There has been a significant amount of research conducted on scheduled overtime on construction labor productivity. However, little information has been found in the literature addressing the labor inefficiency associated with working a second shift. This paper has qualitative and quantitative components. The qualitative part details why and how shift work affects labor productivity, and then addresses the appropriate use of shift work. The quantitative component determines the relationship between the length of shift work and labor efficiency. The results of the research show that shift work has the potential to be both beneficial and detrimental to the productivity of construction labor. Small amounts of well-organized shift work can serve as a very effective response to schedule compression. The productivity loss, obtained from the quantification model developed through this study, ranges from -11 to 17% depending on the amount of shift work used.

KW - Construction industry

KW - Contractors

KW - Labor

KW - Productivity

KW - Scheduling

UR - http://www.scopus.com/inward/record.url?scp=39349099123&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=39349099123&partnerID=8YFLogxK

U2 - 10.1061/(ASCE)0733-9364(2008)134:3(197)

DO - 10.1061/(ASCE)0733-9364(2008)134:3(197)

M3 - Article

VL - 134

SP - 197

EP - 204

JO - Journal of Construction Engineering and Management - ASCE

JF - Journal of Construction Engineering and Management - ASCE

SN - 0733-9364

IS - 3

ER -