Concurrent resource allocation for production scheduling

Alberto Vasquez, Pitu Mirchandani

Research output: Chapter in Book/Report/Conference proceedingConference contribution

5 Scopus citations

Abstract

A concurrent modeling approach for solving production control problems is presented. The approach concentrates on developing a common model formulation to represent the problem for different purposes. A unique mathematical representation is used that can support a hierarchically structured control system for production scheduling problems. The appropriate representations are obtained at each level of the hierarchy by using Lagrangian relaxations. The model can also be used within each level of the hierarchy to develop fast and efficient heuristics for detailed scheduling.

Original languageEnglish (US)
Title of host publicationProceedings - IEEE International Conference on Robotics and Automation
PublisherPubl by IEEE
Pages1060-1066
Number of pages7
Volume2
StatePublished - 1991
Externally publishedYes
EventProceedings of the 1991 IEEE International Conference on Robotics and Automation - Sacramento, CA, USA
Duration: Apr 9 1991Apr 11 1991

Other

OtherProceedings of the 1991 IEEE International Conference on Robotics and Automation
CitySacramento, CA, USA
Period4/9/914/11/91

ASJC Scopus subject areas

  • Software
  • Control and Systems Engineering

Fingerprint

Dive into the research topics of 'Concurrent resource allocation for production scheduling'. Together they form a unique fingerprint.

Cite this