Analyzing the successful development of a high-novelty innovation project under a time-pressured schedule

Andrew Kach, Arash Azadegan, Kevin Dooley

Research output: Contribution to journalArticle

13 Citations (Scopus)

Abstract

Research has identified numerous determinants leading to the success of new product development (NPD) projects. However, which particular determinants carry more importance when developing high-novelty projects under tight time constraints have yet to be clarified. We study the development of ECJ-400 of Eclipse Aircraft Company, a highly innovative new jet airplane that was designed and built in a very aggressive 229-day timetable. Through an in-depth case analysis using interviews with members of the four companies involved in the design, manufacturing, and flight testing of the airplane, we enquire about the underlying factors that led to the successful creation of this product. Propositions were formulated and then depicted respectively through the development of a casual network diagram. Our study contributes to the NPD speed literature by highlighting the particular interrelationships between determinants that are influential toward highly novel time-pressured NPD projects.

Original languageEnglish (US)
Pages (from-to)377-400
Number of pages24
JournalR and D Management
Volume42
Issue number5
DOIs
StatePublished - Nov 2012

Fingerprint

Product development
Innovation
Aircraft
Industry
Testing
Novelty
Schedule
New product development
Development projects
European Court of Justice
Factors
Time constraints
Interrelationship
Case analysis
Diagrams
Manufacturing

ASJC Scopus subject areas

  • Business and International Management
  • Management of Technology and Innovation
  • Strategy and Management
  • Business, Management and Accounting(all)

Cite this

Analyzing the successful development of a high-novelty innovation project under a time-pressured schedule. / Kach, Andrew; Azadegan, Arash; Dooley, Kevin.

In: R and D Management, Vol. 42, No. 5, 11.2012, p. 377-400.

Research output: Contribution to journalArticle

@article{9444f82044684cbfa6afa6ffa00b9411,
title = "Analyzing the successful development of a high-novelty innovation project under a time-pressured schedule",
abstract = "Research has identified numerous determinants leading to the success of new product development (NPD) projects. However, which particular determinants carry more importance when developing high-novelty projects under tight time constraints have yet to be clarified. We study the development of ECJ-400 of Eclipse Aircraft Company, a highly innovative new jet airplane that was designed and built in a very aggressive 229-day timetable. Through an in-depth case analysis using interviews with members of the four companies involved in the design, manufacturing, and flight testing of the airplane, we enquire about the underlying factors that led to the successful creation of this product. Propositions were formulated and then depicted respectively through the development of a casual network diagram. Our study contributes to the NPD speed literature by highlighting the particular interrelationships between determinants that are influential toward highly novel time-pressured NPD projects.",
author = "Andrew Kach and Arash Azadegan and Kevin Dooley",
year = "2012",
month = "11",
doi = "10.1111/j.1467-9310.2012.00690.x",
language = "English (US)",
volume = "42",
pages = "377--400",
journal = "R and D Management",
issn = "0033-6807",
publisher = "Wiley-Blackwell",
number = "5",

}

TY - JOUR

T1 - Analyzing the successful development of a high-novelty innovation project under a time-pressured schedule

AU - Kach, Andrew

AU - Azadegan, Arash

AU - Dooley, Kevin

PY - 2012/11

Y1 - 2012/11

N2 - Research has identified numerous determinants leading to the success of new product development (NPD) projects. However, which particular determinants carry more importance when developing high-novelty projects under tight time constraints have yet to be clarified. We study the development of ECJ-400 of Eclipse Aircraft Company, a highly innovative new jet airplane that was designed and built in a very aggressive 229-day timetable. Through an in-depth case analysis using interviews with members of the four companies involved in the design, manufacturing, and flight testing of the airplane, we enquire about the underlying factors that led to the successful creation of this product. Propositions were formulated and then depicted respectively through the development of a casual network diagram. Our study contributes to the NPD speed literature by highlighting the particular interrelationships between determinants that are influential toward highly novel time-pressured NPD projects.

AB - Research has identified numerous determinants leading to the success of new product development (NPD) projects. However, which particular determinants carry more importance when developing high-novelty projects under tight time constraints have yet to be clarified. We study the development of ECJ-400 of Eclipse Aircraft Company, a highly innovative new jet airplane that was designed and built in a very aggressive 229-day timetable. Through an in-depth case analysis using interviews with members of the four companies involved in the design, manufacturing, and flight testing of the airplane, we enquire about the underlying factors that led to the successful creation of this product. Propositions were formulated and then depicted respectively through the development of a casual network diagram. Our study contributes to the NPD speed literature by highlighting the particular interrelationships between determinants that are influential toward highly novel time-pressured NPD projects.

UR - http://www.scopus.com/inward/record.url?scp=84867892120&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84867892120&partnerID=8YFLogxK

U2 - 10.1111/j.1467-9310.2012.00690.x

DO - 10.1111/j.1467-9310.2012.00690.x

M3 - Article

VL - 42

SP - 377

EP - 400

JO - R and D Management

JF - R and D Management

SN - 0033-6807

IS - 5

ER -