Analysis of best-value pricing

Dean T. Kashiwagi, John Savicky

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Abstract

The implementation of performance information procurement system (PIPS), a performance contracting process, is discussed. It is found that the PIPS implementation is successful on painting, roofing, waterproofing, mechanical and general construction projects. The analysis shows that the PIPS increased the level of performance of the contractors at a very small increase in first cost.

Original languageEnglish (US)
Title of host publicationAACE International. Transactions of the Annual Meeting
StatePublished - 2002
Event46th Annual Meeting of AACE International - Portland, OR, United States
Duration: Jun 23 2002Jun 26 2002

Other

Other46th Annual Meeting of AACE International
CountryUnited States
CityPortland, OR
Period6/23/026/26/02

    Fingerprint

ASJC Scopus subject areas

  • Industrial and Manufacturing Engineering

Cite this

Kashiwagi, D. T., & Savicky, J. (2002). Analysis of best-value pricing. In AACE International. Transactions of the Annual Meeting