TJS07001A-LZ: IEC 61646 Tests of Tianjin Jinneng Solar 40(46)H/G640*1249A Photovoltaic modules

Project: Research project

Project Details

Description

TJS07001A-LZ: IEC 61646 Tests of Tianjin Jinneng Solar 40(46)H/G640*1249A Photovoltaic modules TJS07001A-LZ: IEC 61646 Tests of Tianjin Jinneng Solar 40(46)H/G640*1249A Photovoltaic modules The tests will be conducted on Tianjin Jinneng Solar 40(46)H/G640*1249A photovoltaic modules. A total of NUMBER unconditioned production modules will be required to complete the test program, as shown in the attached Test Quote Work Sheet, dated 5/12/08. IEC 61646 TEST SEQUENCE C is being repeated based on a single test failure in TEST SEQUENCE C of project 1}S07001-LZ. TlANJIN JINNENG SOLAR has agreed to begin this test program prior to the completion of project TJS07001-LZ. If a second test failure becomes evident in TJS07001-LZ, the results of this project become void. TlANJIN JINNENG SOLAR recognizes the risk associated with running this test program prior to the completion of 1}S0700l-LZ. No changes have been made to the design of the MODEL modules submitted for the repeat testing.
StatusFinished
Effective start/end date6/17/0812/31/09

Funding

  • INDUSTRY: Foreign Company: $4,302.00

Fingerprint

Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.