Factory Capacity Allocation Solver for Rapid within Shift Re-Planning

Project: Research project

Project Details

Description

Factory Capacity Allocation Solver for Rapid within Shift Re-Planning Factory Capacity Allocation Solver for Rapid within Shift Re-Planning Create and verify an execution capacity allocation model for an entire Assembly-Test factory to meet the customer demand. The model will be run at least daily and will generate a production schedule (or production goal) per product group per operation for next fourteen days (planning horizon chosen based on the expected TPT for the Assembly-Test factories) for each of the major equipment groups in the factory. The model will also consider parameters or restrictions which will include: the capacity, product, route, operation, machine entity, run rate, setup time, PM schedule, calendar, lot size, fixture (such as tester kit), qualification matrix, material availability and the TPT. The allocation model will consist of a production plan generator and a scheduler. The production plan generator uses two basic formulations: LP formulation and MRP formulation, to get aggregated production plans, which will then be fed into the scheduler to generate detail production schedules and statistics report. We will also develop a solution methodology that directly integrates information from the scheduler into the production plan generator to intelligently adjust parameters and allow iterative improvement of the solution. The stochastic simulation will verify the efficacy of the results across variety of scenarios.
StatusFinished
Effective start/end date12/1/0912/31/10

Funding

  • INDUSTRY: Domestic Company: $95,000.00

Fingerprint

Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.