Design, Modeling, and Control of Hybrid ESS for DoD Microgrids (Phase 2)

Project: Research project

Project Details

StatusActive
Effective start/end date7/29/207/29/23

Funding

  • DOD-ARMY: Army Corps of Engineers (USACE): $668,814.00