Projects per year
- 1,250 - 1,300 out of 1,332 results
Search results
-
Finished
THE CREATION OF A SCENARIO-BASED, DYNAMIC PROGRAM MANAGEMENT WORKBENCH USING THE LEAN ENTERPRISE MODEL
5/1/99 → 4/30/00
Project: Research project
-
ANALYSIS AND IMPROVEMENT OF DEVELOPMENT AND TESTING PROCESSES FOR SAFETY CRITICAL SYSTEMS
3/15/99 → 8/13/99
Project: Research project
-
COMPUTER NETWORK EQUIPMENT FOR INTRUSION DETECTION RESEARCH
3/1/99 → 2/29/00
Project: Research project
-
PERFORMANCE ANALYSIS OF SEMICONDUCTOR MANUFACTURING EQUIPMENT
2/15/99 → 5/15/99
Project: Research project
-
-
FACULTY EARLY CAREER DEVELOPMENT: DEVELOPMENT OF AN INTEGRATED ENVIRONMENT FOR SURFACE MOUNT DEVICE TECHNOLOGY
National Science Foundation (NSF)
1/15/99 → 5/31/01
Project: Research project
-
A PROCESS CONTROL & DIAGNOSIS APPROACH TO INDICATIONS & WARNING OF ATTACKS ON COMPUTER NETWORKS
10/1/98 → 9/30/99
Project: Research project
-
A PROCESS ENGINEERING APPROACH TO THE DEVELOPMENT AND INTEGRATION OF INTRUSION DETECTION TECHNIQUES
10/1/98 → 12/31/01
Project: Research project
-
REALIZING INTEROPERABILITY WITH PCIS2 PROCESS SERVICES
Lindquist, T.
DOD-NAVY-SPAWAR: Naval Command Control and Ocean Surveilance Center (NCCOSC)
9/28/98 → 5/15/00
Project: Research project
-
DISTJUNCTIVE PLANNING - A UNIFIED APPROACH FOR SCALING UP PLAN SYNTHESIS
National Science Foundation (NSF)
9/1/98 → 8/31/03
Project: Research project
-
-
PERFORMANCE MODELING FOR THE DESIGN OF A SEMICONDUCTOR PACKAGE ASSEMBLY PROCESS
7/16/98 → 10/15/98
Project: Research project
-
DEVELOPMENT OF COMMUNICATION SOFTWARE FOR AUTOMATIVE DIAGNOSTICS
7/9/98 → 12/31/98
Project: Research project
-
CROSS-TRAINING TECHNICIANS & ENGINEERS FOR SEMICONDUCTOR MANUFACTURING
NSF: Directorate for Computer & Information Science & Engineering (CISE)
7/1/98 → 6/30/01
Project: Research project
-
-
-
RAPID PROTOTYPE OF A DECISION SUPPORT SYSTEM FOR THE LEAN ENTERPRISE MODEL
6/15/98 → 4/30/99
Project: Research project
-
DEVELOPENT AND SYSTEM EVALUATION OF AIRLOOP NETWORK INTERFACE UNIT
5/26/98 → 1/31/99
Project: Research project
-
PROCEDURES FOR CAPACITY MODELING IN SEMICONDUCTOR MANUFACTURING
5/16/98 → 5/31/99
Project: Research project
-
-
-
EXPLORING DISJUNCTIVE PLANNING AS A MEANS TO SCALE-UP PLAN SYNTHESIS
4/3/98 → 7/15/00
Project: Research project
-
-
COMPONENT-BASED REAL-TIME APPLICATION SOFTWARE DEVELOPMENT
3/25/98 → 1/31/01
Project: Research project
-
QS9000 QUALITY SYSTEMS FOR WATER FABRICATION
Runger, G., Montgomery, D. & Fowler, J.
2/18/98 → 8/31/98
Project: Research project
-
-
VALUE CHAIN INTEGRATION IN SEMICONDUCTOR MANUFACTURING
INDUSTRY: Various Consortium Members
2/2/98 → 12/30/98
Project: Research project
-
BEST PRACTICES, MATURITY, AND DIFFUSTION IN NEW PRODUCT DEVELOPMENT
National Science Foundation (NSF)
2/1/98 → 6/30/00
Project: Research project
-
NSF INDUSTRY-UNIVERSITY COOPERATIVE RESEARCH CENTER FOR QUALITY AND RELIABILITY ENGINEERING
OTHER: Domestic Non-ABOR University
1/2/98 → 5/31/02
Project: Research project
-
MODEL-BASED ASSESSMENT OF CAMPAIGN PLAN PERFORMANCE UNDER UNCERTAINTY
1/1/98 → 3/31/99
Project: Research project
-
NATIONAL SCIENCE FOUNDATION INDUSTRY/UNIVERSITY COOPERATIVE RESEARCH CENTER FOR QUALITY OF RELIABILITY ENGINEERING
NSF: Directorate for Engineering (ENG)
10/15/97 → 9/30/01
Project: Research project
-
-
WAFER FAB OPERATIONS: MODELING, ANALYSIS, & DESIGN
National Science Foundation (NSF)
10/1/97 → 5/31/01
Project: Research project
-
-
DATA STRUCTURES FOR MULTIVARIATE STATISITICAL PROCESS CONTROL
National Science Foundation (NSF)
9/1/97 → 8/31/01
Project: Research project
-
MODELING AND ANALYSIS OF 300MM WAFER FABRICATION OPERATIONS
9/1/97 → 12/31/98
Project: Research project
-
CONTINUATION OF ECE 394 INTRODUCTION TO MANUFACTURING ENGINEERING AT INTEL
8/26/97 → 8/14/04
Project: Research project
-
-
-
MODELING DATA STANDARDS
INDUSTRY: Various Consortium Members
5/15/97 → 12/31/97
Project: Research project
-
-
PCIS-II: DISTRIBUTED COMPONENT-BASED SOFTWARE ENGINEERING
Lindquist, T.
DOD-NAVY: Office of Naval Research (ONR)
5/1/97 → 11/30/98
Project: Research project
-
RESEARCH & DEVELOPOMENT OF A SYSTEM DYNAMICS SOFTWARE PROJECT & TRACKING TOOL
4/23/97 → 12/31/97
Project: Research project
-
THE ROLE OF THE INDUSTRIAL ENGINEER IN SEMICONDUCTOR MANUFACTURING
3/1/97 → 8/31/97
Project: Research project
-
OVERALL EQUIPMENT EFFECTIVENESS IN SEMICONDUCTOR MANUFACTURING
3/1/97 → 8/31/97
Project: Research project
-
-
JOINT ASU/AMERICAN EXPRESS TRS COMPANY EFFORT IN INSTRUCTION OF LARGE GRAIN INFORMATION SYSTEMS ENGINEERING
Collofello, J. & Panchanathan, S.
8/16/96 → 5/5/99
Project: Research project
-
-
MODELING & SIMULATION FOR PRODUCTIVITY IMPROVEMENT OF A SEMICONDUCTOR PRODUCTION LINE
7/15/96 → 12/31/01
Project: Research project
-