Projects per year
Projects
Search results
-
Finished
GROUP EFFECTS & EFFICIENCY FACTORS FOR LATERALLY LOADED PILES
Houston, S.
11/3/97 → 12/31/98
Project: Research project
-
PROPOSAL FOR CHEMICAL ANALYSIS AT GILBERT WATER RECLAMATION SITE
LOCAL: Arizona Municipal Government
9/1/97 → 6/30/98
Project: Research project
-
CENTRAL ARIZONA-PHOENIX LTER
Kinzig, A., Redman, C., Christensen, P., Arrowsmith, R., Wentz, E., Wu, J., Grimm, N., Westerhoff, P. & Anderies, J.
NSF: Directorate for Biological Sciences (BIO)
8/18/97 → 12/31/06
Project: Research project
-
MECHANICAL TESTING & DESIGN OPTIMIZATION OF LIGHTWIEGHT STEEL FRAMING SYSTEMS
5/16/97 → 12/15/97
Project: Research project
-
DAMPING CHARACTERISTICS AND ENERGY ABSORPTION OF FLOORR ISOLATION SEISMIC DAMPERS SUBJECTED TO GROUND ACCELERATION
2/20/97 → 4/20/97
Project: Research project
-
-
ENHANCING HYDRAULIC LOADING CAPACITY OF RECHARGE BASINS FOR NWWRP
LOCAL: Arizona Municipal Government
10/1/96 → 8/15/03
Project: Research project
-
SOIL AQUIFER TREATMENT FOR SUSTAINABLE WATER REUSE: INITIAL 6 MONTH STUDY
LOCAL: Arizona Municipal Government
10/1/96 → 7/1/97
Project: Research project
-
SOIL AQUIFER TREATMENT FOR SUSTAINABLE WATER REUSE: INITIAL SIX-MONTH STUDY
LOCAL: Arizona Municipal Government
10/1/96 → 10/1/96
Project: Research project
-
TENTH INTERNATIONAL ROAD FEDERATION EXECUTIVE CONFERENCE ON ROAD MANAGEMENT
10/1/96 → 11/30/96
Project: Research project
-
MECHANICAL RESPONSE OF GLASS/EPOXY AND CARBON/EPOXY SYSTEMS
9/13/96 → 10/13/96
Project: Research project
-
VERIFICATION OF DESIGN CRITERIA FOR VEHICLE CONNECTING DEVICES
9/12/96 → 7/31/97
Project: Research project
-
MECHANICAL TESTING & DESIGN OPTIMIZATION OF LIGHTWEIGHT STEEL FRAMING SYSTEMS
4/1/96 → 10/1/96
Project: Research project
-
-
SAFE WELL MAINTENANCE TECHNOLOGY FOR DIRECT RECHARGE OF TERTIARY EFFLUENT
Arizona Department of Water Resources
11/6/95 → 7/15/97
Project: Research project
-
-
DESIGN OF A SYSTEM TO LIMIT COLIFORM BACTERIA IN LAKE HAVASU
Arizona Department of Environmental Quality
5/8/95 → 9/30/95
Project: Research project
-
INVESTIGATION OF GROUNDWATER RECHARGE WITH HIGH-QUALITY WATER
Arizona Department of Water Resources
11/7/94 → 6/30/97
Project: Research project
-
PREPARATION OF SOFTWARE FOR DESIGN & OPERATION OF OPTIMAL OP
Arizona Department of Water Resources
11/2/94 → 2/7/97
Project: Research project
-
-
-
PAVEMENT MAINTENANCE TREATMENT/EFFECTIVENESS
DOT: Federal Highway Administration (FHWA)
6/10/94 → 9/30/98
Project: Research project
-
POZZOLANIC EFFECTS OF COPPER SLAG IN CEMENTITIOUS MATERIALS
5/15/94 → 5/15/95
Project: Research project
-
-
SRPASU COOPERATIVE AGREEMENT
Westerhoff, P., Dey, S., Wiezel, A., Fox, P., Lee, T., Mobasher, B., Mignolet, M. & Ariaratnam, S.
7/1/93 → 4/30/12
Project: Research project
-
-
-
-
XDRESEA INITIATION OF PROCESS TECH FOR MANUF HIGH-PERF CEMEN
National Science Foundation (NSF)
8/15/92 → 7/31/96
Project: Research project
-
-
PEACE FELLOWSHIP #4232
US Agency for International Development (USAID)
3/1/92 → 7/31/92
Project: Research project
-
ENHANCE. OF REDUC. DECHLORINATION IN ANAEROBIC REACTOR SYS.
10/15/91 → 2/14/93
Project: Research project
-
HIGHWAY MATERIALS ENGINEERING
US Department of Transportation (DOT)
12/24/90 → 6/23/92
Project: Research project
-
DYNAMIC TESTING OF POROUS ASPHALT MIXES
Arizona State Research Institute
10/1/90 → 1/21/91
Project: Research project
-
-
BRIDGE APPROACH SLAB & EXPANSION JOINT GUARD FAILURE ANALYSI
US Department of Transportation (DOT)
11/1/88 → 2/15/89
Project: Research project
-
PAVEMENT EVALUATION STUDY
LOCAL: Arizona Municipal Government
2/5/88 → 8/5/88
Project: Research project
-
NUCLEAR DENSITY TESTING OF GRANULAR MATERIALS
US Department of Transportation (DOT)
2/1/88 → 12/15/88
Project: Research project
-
RATIONAL CHARA. OF PAVEMENT STRUCTURES USING DEFLECTION ANLY
Arizona Department of Transportation (ADOT)
8/18/86 → 5/31/90
Project: Research project