Projects per year
- 1 - 50 out of 1,379 results
Search results
-
AUTO CONFIGURATION MGMT FOR A TO Z ENGR PROJ SUPPORT ENVIRON
6/1/87 → 5/31/88
Project: Research project
-
-
-
-
-
-
-
-
APPROXIMATE EVALUATION OF LOGIC PROGRAMS
National Science Foundation (NSF)
10/1/90 → 9/30/92
Project: Research project
-
PERFORMANCE BENCHMARKS FOR DISTRIBUTED HETEROGENEOUS DATABAS
1/2/91 → 12/31/92
Project: Research project
-
-
-
ALLIANCE FOR MINORITY PARTICIPATION
National Science Foundation (NSF)
3/1/92 → 12/31/93
Project: Research project
-
-
-
-
-
EXPLORING FUNDAMENTAL UTILITY TRADEOFFS W PLAN REUSE
National Science Foundation (NSF)
7/1/92 → 3/31/96
Project: Research project
-
-
SUPPORT FOR THE REAL-TIME PRODUCT FLOW CONTROL IN SEMICONDUCTOR MANUFACTURING PROJECT
National Science Foundation (NSF)
3/1/96 → 10/15/96
Project: Research project
-
AUTOMATED ANNOTATION FOR THE ANALYSIS & MODIF OF PLANS
DOD: Defense Advanced Research Projects Agency (DARPA)
3/30/93 → 12/31/96
Project: Research project
-
-
-
-
THE ROLE OF THE INDUSTRIAL ENGINEER IN SEMICONDUCTOR MANUFACTURING
3/1/97 → 8/31/97
Project: Research project
-
OVERALL EQUIPMENT EFFECTIVENESS IN SEMICONDUCTOR MANUFACTURING
3/1/97 → 8/31/97
Project: Research project
-
PRODUCTIVITY ISSUES IN A/P/T ISSUES
INDUSTRY: Various Consortium Members
1/1/96 → 9/30/97
Project: Research project
-
RESEARCH & DEVELOPOMENT OF A SYSTEM DYNAMICS SOFTWARE PROJECT & TRACKING TOOL
4/23/97 → 12/31/97
Project: Research project
-
MODELING DATA STANDARDS
INDUSTRY: Various Consortium Members
5/15/97 → 12/31/97
Project: Research project
-
-
DATABASE LAB INSTRUCTION FOR UNDERGRADS: A COOPERATIVE LEARN
National Science Foundation (NSF)
7/1/94 → 12/31/97
Project: Research project
-
-
-
-
-
R&D SOFTWARE PROCESS & TECHNOLOGY ASSESSMENT & SELECTION TOOL
8/16/95 → 8/16/98
Project: Research project
-
OBJECT ORIENTED APPROACH TO AUTONOMOUS DECENTRALIZED SOFTW
8/22/94 → 8/21/98
Project: Research project
-
QS9000 QUALITY SYSTEMS FOR WATER FABRICATION
Runger, G., Montgomery, D. & Fowler, J.
2/18/98 → 8/31/98
Project: Research project
-
SYNTHESIS TECHNOLOGY FOR CRISIS MANAGEMENT
DOD: Defense Advanced Research Projects Agency (DARPA)
9/27/95 → 9/26/98
Project: Research project
-
PERFORMANCE MODELING FOR THE DESIGN OF A SEMICONDUCTOR PACKAGE ASSEMBLY PROCESS
7/16/98 → 10/15/98
Project: Research project
-
PCIS-II: DISTRIBUTED COMPONENT-BASED SOFTWARE ENGINEERING
Lindquist, T.
DOD-NAVY: Office of Naval Research (ONR)
5/1/97 → 11/30/98
Project: Research project
-
VALUE CHAIN INTEGRATION IN SEMICONDUCTOR MANUFACTURING
INDUSTRY: Various Consortium Members
2/2/98 → 12/30/98
Project: Research project
-
DEVELOPMENT OF COMMUNICATION SOFTWARE FOR AUTOMATIVE DIAGNOSTICS
7/9/98 → 12/31/98
Project: Research project
-
DRAWING AGORITHMS FOR LARGE & DYNAMICALLY CHANGING GRAPHS: A RESEARCH PROPOSAL
DOC: National Institute of Standards and Technology (NIST)
2/1/96 → 12/31/98
Project: Research project
-
MODELING AND ANALYSIS OF 300MM WAFER FABRICATION OPERATIONS
9/1/97 → 12/31/98
Project: Research project
-
TESTING & ANALYSIS OF ACTIVE DATABASE RULES
National Science Foundation (NSF)
6/1/95 → 12/31/98
Project: Research project
-
-
-
DEVELOPENT AND SYSTEM EVALUATION OF AIRLOOP NETWORK INTERFACE UNIT
5/26/98 → 1/31/99
Project: Research project
-